![]() | 25.4 2011 05:00 |
![]() | 25.4 2011 06:00 |
![]() | 25.4 2011 07:00 |
![]() | 25.4 2011 08:00 |
![]() | 25.4 2011 09:00 |
![]() | 25.4 2011 10:00 |
Temporary shift to diesel generator for pumps for water injection water to reactors to allow the connection of the high voltage power panel of Unit 1/2 and Unit 5/6 | 25.4 2011 10:57 |
![]() | 25.4 2011 11:00 |
![]() | 25.4 2011 12:00 |
The pump of the residual heat removal system for unit 5 temporarily stopped | 25.4 2011 12:22 |
![]() | 25.4 2011 13:00 |
![]() | 25.4 2011 14:00 |
Pump for nitrogen injection to unit 1 temporarily stopped | 25.4 2011 14:10 |
![]() | 25.4 2011 15:00 |
![]() | 25.4 2011 16:00 |
![]() | 25.4 2011 17:00 |
![]() | 25.4 2011 18:00 |
Water spray to SFP4, concrete pump | 25.4 2011 18:15-26.4 2011 00:26 |
![]() | 25.4 2011 19:00 |